MD Groundworks successfully delivered the full design and installation of HV and LV electrical systems for the Stane Park Retail Development. Acting as a specialist subcontractor, we completed the 10-month project on time and within budget, supporting the delivery of 10 commercial retail units with reliable and sustainable power infrastructure.
Project Overview
Location: Stane Park, Essex
End Users: 10 Commercial Retail Units
Duration: 10 months
Scope: Full HV/LV Electrical Infrastructure Installation
DNO: UK Power Networks
Scope of Work
MD Groundworks was responsible for the end-to-end delivery of electrical infrastructure, including:
- Design and installation of an offsite 11kV cable route (approx. 2km)
- Construction and fit-out of a dual-transformer substation
- Full HV and LV cable terminations
- LV cable distribution across the development to meter points and service heads
- Integration with UKPN’s primary substation
Offsite HV Cable Installation
We delivered a high-quality, DNO-compliant installation of 2,400 metres of 11kV high-voltage cable connecting the site to UKPN infrastructure. Key deliverables:
- Trenching: 450mm wide x 900mm deep
- Ducting and reinstatement of the public highway to HAUC standards
- Completion of 7 joint bays with cables installed at 250m intervals
- Zero sheath damage and full cable integrity throughout
Onsite Substation Construction
Our experienced electrical and civil teams constructed and commissioned the on-site substation, including:
- Installation of dual 11kV transformers
- HV and LV switchgear configuration
- All necessary cable terminations and testing
- Energization and handover in accordance with UKPN guidelines
Sustainability & Logistics
The project was supported by our Wickford depot, located just 40 minutes from site, allowing:
- Reduced carbon emissions through efficient material transport
- Lower fuel use and minimal environmental impact
- Rapid deployment of tools, plant, and materials
Project Outcomes
The Stane Park project was successfully delivered to the satisfaction of all key stakeholders, including:
- The main client
- UK Power Networks
- Essex County Council
MD Groundworks demonstrated expertise in electrical infrastructure installation, substation construction, and HV/LV cable works, reinforcing our position as a trusted electrical and groundworks subcontractor in Essex and the South East.